Interior · Expertise 04 of 18

Kitchen Remodeling

Fully permitted kitchen renovations. Fixed price at signing. Cabinetry, quartz and stone tops, tile, appliance integration, gas and 240V electrical relocations. Six to twelve week typical scope.

What's included · what's not

The full scope in writing before we start.

Nothing hides behind “allowance TBD.” The fixed-bid proposal lists every line the way it’s going to appear on the invoice. Timeline: 6–12 weeks typical.

Included in the fixed bid

  • Existing-conditions site visit
  • Permit drawings + HOA approvals
  • Full demolition + haul-off
  • Rough plumbing, electrical, mechanical
  • Cabinetry installation
  • Quartz / stone / solid-surface tops
  • Tile backsplash + flooring
  • Appliance integration

Not included (transparent)

  • Appliance purchase (installed only)
  • Custom lighting fixture supply
  • Structural changes not on original drawings

Timeline

6–12 weeks typical. The exact window is committed in writing at contract signing.

License stack

  • General Contractor · FL #CGC1525289
  • Roofing Contractor · FL #CCC1335157
  • Mechanical Contractor · FL #CMC1251666
  • Plumbing Contractor · FL #CFC1434398
  • Electrical Contractor · FL #EC13015530
Why this scope, done under one contract

The reason Dellamano projects finish on a written schedule.

01All five licenses, one owner

General, Roofing, Mechanical, Plumbing, and Electrical — every one held personally by Aldo Dellamano.

02Fixed-bid or cost-plus, always in writing

Every project on a written contract — fixed-bid or transparent cost-plus — signed before work starts. Allowances listed upfront.

03Every trade under one license holder

Whether our own crew does the work or a vetted subcontractor does, every trade runs under Aldo’s licenses and inspection schedule. You never chase a sub; you call one number.

04One warranty conversation

One contractor, one signature, one number to call when questions come up later.

Frequently asked

Kitchen Remodeling · the questions Aldo answers every week.

How long does a typical South Florida kitchen remodel take?

Six to twelve weeks from demo to final walkthrough. Long-lead cabinetry or imported stone can push the far end. Every fixed-bid commits to a specific window in writing.

Do you handle permits, inspections, and HOA approvals?

Every permit signed by Aldo personally under FL CGC #1525289. Inspections scheduled by our office. HOA architectural submittals prepared on your behalf.

Are gas line and 240V electrical relocations included in the bid?

Yes. Mechanical, plumbing, and electrical licenses in-house — self-performed, priced into the fixed bid.

Can I buy my own appliances?

Yes. Owner-supplied appliances are welcome; we install, connect, and integrate.

More scopes under one contract

Other expertise often paired with Kitchen Remodeling.

Kitchen Remodeling · under one contract

Fixed price at signing. Built to a written schedule.

Tell us about the kitchen remodeling scope. You’ll hear back promptly with a walk-through scheduled and a path to a written proposal.

Text Aldo Call the office